10-Step Project Delivery Process
A transparent, disciplined execution framework extracted directly from Page 12 of our corporate pre-qualification dossier, governing every contract from site dimensioning to TOC handover.
Stakeholder Engagement Plan
Identifying client representatives, consulting engineers, municipal authorities (DM/DMT), and setting formal communication channels.
Roles, Responsibilities & RACI Matrix
Assigning dedicated Project Director, Site Engineer, HSE Officer, and MEP Coordinator with clear decision boundaries.
Site Kickoff & Dimensioning Survey
On-site laser boundary verification, benchmark level setting, existing utility tracing, and photographic pre-condition recording.
Project Scope Statement & Authority Submissions
Finalizing detailed scope narratives, engineering shop drawings, and submitting NOC applications to master developers and municipalities.
Scope Baseline & Work Breakdown (WBS)
Locking the frozen architectural baseline and decomposing the project into measurable work packages and bill of quantity items.
Critical Path Schedule (CPM)
Developing Primavera / MS Project Gantt charts highlighting concrete curing periods, authority inspection hold points, and handover.
Subsidiary Management Plans
Formulating task-specific Quality Management, Cost Control, Procurement Schedules, and Risk Mitigation registers.
Staffing & Fleet Mobilization
Mobilizing vetted labor, certified plant equipment (bobcats, mini-excavators, laser compactors), and temporary site offices within 14 days.
QA/QC Inspections & Method Statements
Executing mandatory hold-point tests: concrete cube testing, 72-hr pool hydrostatic tests, daily JSA toolbox briefings, and municipal inspections.
Zero-Defect Snagging & TOC Handover
Conducting internal pre-handover audits, issuing as-built drawings and operation manuals, and securing the official Taking Over Certificate.