Construction
Saadiyat Island Modern Extension & Pool
Structural extension adding a 2-storey guest wing, modern glass gym pavilion, and 12-meter heated lap pool overlooking protected coastal mangroves.
Client
Saadiyat Beach Resident
Location
📍 Abu Dhabi
Project Scale
8,500 sq.ft
Duration
12 Weeks
Technical Scope & Engineering Solutions
**The Challenge:** High groundwater table on Saadiyat Island required careful dewatering and environmental preservation.
**The Solution:** Installed temporary sheet piling and closed-circuit recharge wells to prevent saline water ingress during basement excavation.
Verified Taking Over Certificate (TOC)
This project was executed under ISO 9001:2015 audited standards and handed over with formal consultant sign-off and zero defect liability issues.
Have a Similar Project?
Our estimating team can provide dimensioned BOQs, site surveys, and authority approval timelines.
Request a Quote → View Pre-Qualification Dossier